SJEH / New Zealand construction

Foundations & concrete quantities

Prepare the concrete and reinforcement quantities for a slab, footing or structural package. We separate the measured work so your team can apply supplier rates, placement costs and project-specific allowances without hiding scope in a single total.

Discuss your project ↗
Reinforced concrete structure with exposed reinforcing bars.
FROM DRAWINGS TO DECISIONSConcrete / m³
Foundations & concrete quantities / scope notes

Volume is only one part of the package.

Concrete pricing depends on geometry, formwork and reinforcement information. Keep those quantities separate so the package can be reviewed properly.

01

Concrete / m³

Use the slab, footing and beam dimensions shown in the structural documents.

02

Formwork / m²

Identify edges, vertical faces and other agreed formed surfaces.

03

Reinforcing / schedule basis

Reference the specified mesh, bars, laps and details; flag missing schedules.

Agreed measurement coverage

What the package includes

  • Concrete volumes split by slabs, footings and other specified elements
  • Formwork areas and relevant edge conditions
  • Reinforcement quantities from the supplied schedules and details
  • Identified assumptions for laps, waste and drawing discrepancies
The final review

Review the section, not only the plan

Changes in slab depth, set-downs and foundation profiles can affect the quantity. Record assumptions where the drawings do not define the geometry.

Discuss this package ↗
One clear next step

Bring your plans.
Let's define the scope.

WhatsAppTalk to our team