SJEH / New Zealand construction

Measured material schedules

Material quantity take-offs for New Zealand building projects, including framing, concrete, masonry, roofing, plasterboard and finishes.

Discuss your project ↗
Measuring tape and pen laid over an architectural drawing.
FROM DRAWINGS TO DECISIONSm / Linear measurement
Measured material schedules / scope notes

The right unit makes the quantity useful.

A measured schedule gives each item a description, unit and drawing reference. Rates can then be applied separately by your team or within an agreed estimating scope.

01

m / Linear measurement

Framing lengths, skirtings and other specified linear elements.

02

m² / Surface measurement

Roof areas, wall linings and floor finishes, with openings handled consistently.

03

m³ / Volume & nr / Counts

Concrete volumes from sections and discrete items from schedules.

Agreed measurement coverage

What the package includes

  • Framing, masonry and concrete reinforcement quantities
  • Roofing, insulation and plasterboard take-offs
  • Flooring, painting and finishing schedules
  • Units, drawing references and measurement assumptions
The final review

Trace the number back to the drawing

Agree how deductions, waste and incomplete details will be handled. Keep measured quantities distinct from purchasing allowances and construction rates.

Discuss this package ↗

Put your estimate to work.

Use the schedules for supplier enquiries, material planning or your own pricing. A quantity-only take-off does not establish a project price unless rates and cost allowances are also agreed.

Supporting projects across New Zealand, including Auckland, Wellington, Christchurch and regional locations. Our service is delivered remotely; attach project files in any format to your quote request, or discuss a transfer method for larger drawing sets.

Explore related services

WhatsAppTalk to our team