Build a coordinated interior package covering wall linings, ceilings, flooring, painting and insulation. SJEH separates quantities by room, level or finish type as agreed, helping builders and subcontractors compare the same scope.

Discuss your project ↗
A tradesperson finishing plasterboard joints during an interior renovation.
FROM DRAWINGS TO DECISIONSWalls & ceilings
Interior material schedules / scope notes

A room-by-room view of the finish.

Different spaces can have different lining systems, finish levels and floor materials. A room-based breakdown keeps those distinctions readable.

01

Walls & ceilings

Separate board types, layers, heights and agreed opening deductions.

02

Floors & skirtings

Measure the specified floor zones and perimeter trims independently.

03

Finishes & insulation

Keep paint areas, insulation locations and specialist finishes identifiable.

Agreed measurement coverage

What the package includes

  • Wall and ceiling lining areas by specified system
  • Floor finishes, skirtings and trims by room or zone
  • Painted surface quantities with coat assumptions identified
  • Insulation areas and specified thickness or performance descriptions
The final review

Selections drive the final package

An unspecified finish should stay visible as a query. Confirm substrate preparation, finish systems and supplier coverage before applying rates.